I am running the new version of GPRM
How do i make each den run separate from each other and then have the top from each den do a grand final? I tried this to day and it didn't work out that way. It just put them all together.
Also I have a GS troop going to race. I tried to add them to a new group when I went to generate the schedual it tossed them in with the boys. Do I have to wait for the Boy's races to be over then start all over with the girls in a new file?
Group and Subgroup Dilemma
-
- Apprentice
- Posts: 6
- Joined: Sat Apr 12, 2008 8:36 pm
- Location: Baltimore, MD
- gpraceman
- Site Admin
- Posts: 4926
- Joined: Fri Jun 20, 2003 12:46 am
- Location: Highlands Ranch, CO
- Contact:
Re: Group and Subgroup Dilemma
If you want them separated, then put them into separate race groups. Each group will get their own schedule. Subgroups have no bearing on scheduling, by design.BaltimoreRob wrote:How do i make each den run separate from each other and then have the top from each den do a grand final? I tried this to day and it didn't work out that way. It just put them all together.
Also I have a GS troop going to race. I tried to add them to a new group when I went to generate the schedual it tossed them in with the boys. Do I have to wait for the Boy's races to be over then start all over with the girls in a new file?
Randy Lisano
Romans 5:8
Awana Grand Prix and Pinewood Derby racing - Where a child, an adult and a small block of wood combine for a lot of fun and memories.
Romans 5:8
Awana Grand Prix and Pinewood Derby racing - Where a child, an adult and a small block of wood combine for a lot of fun and memories.
Re: Group and Subgroup Dilemma
From what I understand you wanting to do, I would use only Groups.
Then use the New Round - Grand Finals option to gather winner(s) from each group you select into a Final.
Then use the New Round - Grand Finals option to gather winner(s) from each group you select into a Final.